• Gossen Metrawatt

Characteristic Values

PROFiTEST MF XTRA PROFiTEST MF TECH PROFiTEST MF XTRA 0105-Set PROFiTEST MF TECH EVSE-Set PROFiTEST MF TECH Meister-Set PROFiTEST MF XTRA Profi-Set PROFiTEST MF TECH 0105-Set PROFiTEST MF XTRA Starter-Set PROFiTEST MF TECH Starter-Set PROFiTEST MF XTRA Meister-Set PROFiTEST MF XTRA - LEMONGREEN
Item number M535H M535K M537H M537D M537C M537M M537B M537K M537A M537L M535T
Product details page Details Details Details Details Details Details Details Details Details Details Details
Indication Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital Digital
Limit value indication x x x x x x x x x x x
Status display of internal memory x x x x x x x x x x x
Measurement functions selectable via rotary switch x x x x x x x x x x x
Structured measured value memory x x x x x x x x x x x
Editable menus x x x x x x x x x x x
Name of inspector editable at test instrument x x x x x x x x x x x
Creation of test procedures x x x x x x x x x x x
Help function with connection diagrams x x x x x x x x x x x
Bluetooth interface
Interface x x x x x x x x x x x
Bidirectional data exchange x x x x x x x x x x x
Updateable x x x x x x x x x x x
PE detection by means of finger contact x x x x x x x x x x x
Automatic measurement cable compensation x x x x x x x x x x x
Offset management x x x x x x x x
Connection for test probe with remote triggering x x x x x x x x
Remote control for testing device x x x x x x x x x x x
Measurement category CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
CAT III 600 V
CAT IV 300 V
Voltage measurement U L-N-PE U L-N
U L-PE
U N-PE
500 V
U L-N
U L-PE
U N-PE
500 V
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
U L-N
U L-PE
U N-PE
500 V
Phase sequence determination x x x x x x x x x x x
Low resistance measurement 200 mA 200 mA 200 mA 200 mA 200 mA 200 mA 200 mA 200 mA 200 mA 200 mA 200 mA
Low resistance measurement with ramp function x x x x x x x x x x x
Isolation resistance measurement x x x x x x x x x x x
Isolation resistance measurement with ramp function x x x x x x x x x x x
Resistances of isolating floors and walls x x x x x x x x x x x
Over voltage protector testing x x x x x x x x x x x
Measurement of standing-surface insulation x x x x x x x x x x x
Loop resistance/impedance measurement x x x x x x x x x x x
Loop measurement without RCD/FI release x x x x x x x x x x x
Detection short-circuit current/overcurrent protection x x x x x x x x x x x
Testing of IT networks 500 V 500 V
Mains internal resistance measurement x x x x x x x x x x x
Voltage drop measurement x x x x x x x x x x x
Earthing measurement x x x x x x x x x x x
Earth resistance measurement battery powered 3-pole measurement / 4-pole measurement
Selective measurement with clamp meter / 4-pole measurement
2-clamp measurement
Resistivity
3-pole measurement / 4-pole measurement
Selective measurement with clamp meter / 4-pole measurement
2-clamp measurement
Resistivity
3-pole measurement / 4-pole measurement
Selective measurement with clamp meter / 4-pole measurement
2-clamp measurement
Resistivity
3-pole measurement / 4-pole measurement
Selective measurement with clamp meter / 4-pole measurement
2-clamp measurement
Resistivity
3-pole measurement / 4-pole measurement
Selective measurement with clamp meter / 4-pole measurement
2-clamp measurement
Resistivity
3-pole measurement / 4-pole measurement
Selective measurement with clamp meter / 4-pole measurement
2-clamp measurement
Resistivity
Earth resistance measurement mains powered 2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
2-pole measurement
3-pole measurement with probe
Selective measurement / 3-pole measurement with probe and current clamp sensor
Selective grounding measurement x x x x x x x x x x
Earth loop measurement x x x x x x x x x x
Specific grounding measurement x x x x x x x x x x
RCD/FI testing x x x x x x x x x x x
RCD/FI testing with rising residual current x x x x x x x x x x x
RCD tripping test with nominal residual current x x x x x x x x x x x
RCD/FI analysis function x x x x x x x x x x x
Curve shape at RCD/FI testing For earth leakage switch type A, F and type B, B+ For earth leakage switch type A, F and type B, B+ For earth leakage switch type A, F and type B, B+
PRCD testing type S, type K x x x x x x x x x x x
Testing of motor protection switch x x x x x x x x x x x
Testing of IMDs and RCMs x x x x x x
Testing of charging devices E-Mobility, simulation of vehicle status x x x x x x x x x x x
Measuring of leakage currents with adapter x x x x x x
Measurement of touch current x x
Measurement of residual voltage x x x x x x
Connection of barcode or RFID reader x x x x x x x x x x x
Connection for current clamp sensors x x x x x x x x x x x
Connection of temperature and humidity sensor
Connection of earth spikes x x x x x x x x x x

Dialogue, Information and Actions: